Cameron Balloons Work Flow [Virtual Factory]

Cameron balloons virtual factory home PageFactory FloorCameron BalloonsCost BreakdownGlossaryLine

Work Flow - Static resource

Production

Several groups work together to build all the separate parts of the balloon.

Cutting and Patterning
  • Fabrics
  • Artwork
  • Sewing
  • Artwork added to balloon
  • Inspection
  • Control lines attached
Hardware

Engineers work on:

  • Gas tanks
  • Burners
  • Inspection
  • Packaged up
Baskets
  • Upholstering
  • Tailor-making
    • Cushions
    • Pockets
  • Inspection
  • Packaged up
Aircraft Registration

Paperwork prepared for governing bodies around the world. This proves the aircraft has been made to standards and is legal.

Index | Next | Previous | Flash version